After-hours and weekend relocations across Perth metro

AFRA member 0000 (sample)[email protected]

Enquiry

Plan your relocation

Four questions. Then a call, a survey and a written proposal with the storage rate quoted from day one, so a fitout delay never becomes a variation.

  • Free site survey, Perth metro
  • Proposal in 3 business days
  • No obligation

What happens after you press send

  • A call within one business dayTen minutes to confirm scope, dates, buildings and any constraint you already know about.
  • A free site survey of both tenanciesWe measure dock height, goods lift internals, door widths, floor loading and the comms room, and photograph all of it.
  • An itemised project priceCrew hours, vehicles, crates per week, storage per module per week and cover options, each on its own line.
  • A draft runsheetTimes, crew numbers, vehicle allocations and contacts, issued before you are asked to commit to a date.

Prefer to talk it through?

(08) 5550 1204

Mon to Fri 7:00 am to 5:30 pm · Sat 7:00 am to 4:00 pm

Step 1 of 4

Takes about a minute. No obligation, and a site survey is free across Perth metro.

What are you moving?
Where from, and where to?

Please tell us the suburb you are moving from.

Please tell us where the office is going.

How big, and when?
Who should your relocation manager call?

Please enter your name.

Please enter your organisation.

Please enter a valid email address.

Please enter a contact number.

We use these details to prepare your relocation proposal and nothing else. See ourprivacy policy.

Enquiry received. A relocation manager will call you.

One of our six relocation managers picks this up and calls within one business day, usually the same morning. Here is what happens next.

  1. Call, same or next business day. Ten minutes to confirm scope, dates and constraints.
  2. Site survey of both tenancies. Free across Perth metro. We measure the dock, the goods lift and the comms room.
  3. Written proposal in three business days. Project price, crate schedule, storage rate and cover options, all itemised.

This is a demonstration form on a demo website. Nothing was submitted and no details were stored. To speak to someone now, call (08) 5550 1204.

Thursday 4:00 pm to Monday 7:30 am

The whole program, recapped. This is the shape of a standard single-floor relocation; multi-floor work stages the same six beats across more nights.

  1. Thu 4:00 pm

    Floors packed, crates labelled

    Staff have packed their own workpoints. Shared areas, kitchens and compactus are packed by our crew. Every crate carries a floor colour and a workpoint number.

  2. Fri 5:00 pm

    Shutdown, comms room first

    Last backup confirmed by your IT team. Devices powered down in order, racks audited, cables labelled at both ends and decanted into anti-static crates.

  3. Fri 8:00 pm

    Dock open, workstations down

    After-hours dock slot opens. Workstations are dismantled, parts bagged to component, tops stillaged and chairs skated. Loading runs to the runsheet, floor by floor.

  4. Sat 7:00 am

    Racks landed, furniture built

    Racks re-racked and patched to the new schedule. Workstations built to the numbered destination plan, desk heights reset, monitor arms refitted, cable trays re-run.

  5. Sun 10:00 am

    First boot and floor walk

    Your IT team powers on and tests while our crew are still on site. Crates are positioned at numbered workpoints. The relocation manager walks every floor against the manifest.

  6. Mon 7:30 am

    Monday-ready, crew on site

    A small crew stays through the first morning for adjustments: desk heights, screen positions, a chair swap, a crate in the wrong bay. Crate collection is booked for the Friday.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.