Case studies
Five programs, with the numbers attached
Client names are withheld, the constraints are not. Each project lists the floor area, the workstation count, the access we were given and what actually happened.
- Resources
- Healthcare
- Engineering
- Education
- Legal

Perth relocations, measured
Figures in these case studies are sample content for a demonstration website, drawn from the shape of real commercial programs.

1,840 m² across two Terrace floors, in one dock window
Two floors, 214 workstations and a live core sample library moved in a single Friday-to-Sunday window with a three-hour nightly dock allocation.
- Floor area
- 1,840 m²
- Workstations
- 214
- Crates
- 612
- Dock slot
- 3 hrs per night
- Downtime
- 0 business days
- Racks
- 4 x 42 RU
Read the project

640 m² of consulting suites, patients back in on Monday
Nine consulting rooms, a treatment room and 18 linear metres of patient records relocated over a weekend with a documented chain of custody.
- Floor area
- 640 m²
- Consulting rooms
- 9
- Record cartons
- 284
- Clinical items
- 11 vendor-handled
- Downtime
- 0 clinic days
- Window
- Fri 6 pm to Sun 4 pm
Read the project

86 workstations out of a building with a 2.1 m basement
A West Perth consultancy with no dock, a 2.1 metre basement clearance and a plan room full of A0 drawing cabinets.
- Floor area
- 910 m²
- Workstations
- 86
- Plan cabinets
- 14 x A0
- Basement clearance
- 2.1 m
- Shuttle runs
- 31
- Window
- Fri 5 pm to Sun 6 pm
Read the project

Administration and student records, inside a two-week term break
A school administration building, a finance office and 22 years of student records relocated between terms, with destruction of time-expired files.
- Floor area
- 1,150 m²
- Staff positions
- 64
- Archive cartons
- 1,190
- Destroyed on authority
- 318 cartons
- Storage
- 11 modules, 6 weeks
- Window
- Term break, 9 days
Read the project

A staged interstate relocation: records first, office second
A commercial practice closing its Perth office and consolidating in Melbourne, sent in two consignments eleven weeks apart.
- Total volume
- 148 m³
- Consignment one
- 46 m³ records
- Consignment two
- 102 m³ office
- Corridor
- Perth to Melbourne
- Transit window
- 7 to 10 business days
- Exceptions
- 0 on reconciliation
Read the project