Education · Joondalup
Administration and student records, inside a two-week term break
A school administration building, a finance office and 22 years of student records relocated between terms, with destruction of time-expired files.

The program in six numbers
- Floor area
- 1,150 m²
- Staff positions
- 64
- Archive cartons
- 1,190
- Destroyed on authority
- 318 cartons
- Storage
- 11 modules, 6 weeks
- Window
- Term break, 9 days
Client name withheld. Figures are sample content for this demonstration website.
The constraint
- Twenty-two years of student and finance records in a basement store, uncatalogued, with no retention dates attached to anything.
- The new administration building was at practical completion minus three weeks when the term break started.
- Everything had to be done and dusted before students returned; there was no option to run over.
The outcome
- 1,190 cartons catalogued, of which 872 were retained and shelved to a scanned location.
- Administration staff working in the new building on the first day of term.
- The school now has a live inventory with destruction dates, which it did not have before the move.
How we ran it
Inventory before uplift
We barcoded and summarised every carton in the basement, then the school's records officer applied retention dates series by series before anything moved.
Storage as a planned stage, not a fallback
Eleven sealed modules held the furniture for six weeks at a quoted weekly rate, so the fitout delay never became a variation.
Authorised destruction
318 time-expired cartons were destroyed on written authority from the school's records officer, with a certificate listing every barcode.
What the client said
We went in with a basement full of unlabelled boxes and came out with an inventory. That was worth more than the move.
Other programs
Mining and resources
1,840 m² across two Terrace floors, in one dock window
Two floors, 214 workstations and a live core sample library moved in a single Friday-to-Sunday window with a three-hour nightly dock allocation.
Read
Healthcare
640 m² of consulting suites, patients back in on Monday
Nine consulting rooms, a treatment room and 18 linear metres of patient records relocated over a weekend with a documented chain of custody.
Read
Engineering
86 workstations out of a building with a 2.1 m basement
A West Perth consultancy with no dock, a 2.1 metre basement clearance and a plan room full of A0 drawing cabinets.
Read